The JJ Mack Building has been designed with the occupier’s wellbeing and satisfaction firmly in mind.
01
BIKE STORAGE, LOCKERS AND SHOWERS
The building boasts 426 bike storage spaces and bike repair stations. This space is complimented by 672 lockers and 30 showers located in high quality changing areas.
DIGITAL VENDING MACHINE
If you forget your shampoo/get a puncture/ladder your tights/need a healthy snack, there is a fully stocked smart, digital vending machine.
AUTOMATIC WATER FOUNTAIN
The building has a touch free, automatic water fountain to encourage the use of refillable water bottles.
USER FRIENDLY STAIRCASES
The building has been designed to encourage wellness and mobility, as such the staircase has been carefully designed to offer a pleasant and healthy alternative to using the lifts.
PARCEL CONCIERGE
Additionally, there is a dry-cleaning service and parcel pick up and drop off lockers for the use of occupiers.
SPECTACULAR VIEWS ACROSS THE CITY AND THE SMITHFIELD CONSERVATION AREA ARE THE
PERFECT BACKDROP FOR POST WORK DRINKS OR A BIT OF LUNCHTIME PEACE AND QUIET.
02
TOUCH-FREE
The building provides a touch free journey from front door to your floor.
FRESH AIR
Occupiers will enjoy an enhanced fresh air supply at 16 litres per person.
AIR QUALITY
The building incorporates air quality sensors in both tenant controlled and common areas. The sensors will communicate information on the air quality directly to the smart building app and internal digital screens.
FLOOR ZONING
Each floor is split into four zones so that it can be operated efficiently, e.g. the ability to run localised air/cooling/heating/lighting tailored to the occupiers’ direct preferences.
MOTION SENSORS
Motion sensors on each floor will transmit occupancy data to the BMS, enabling efficient management operations such as need-based cleaning, lighting, heating and cooling.
LED LIGHTING
The building has optimised internal lighting via full LED lighting design along with PIR and daylight management controls to perimeter spaces.
U-VALUES AND G-VALUES
U-values and G-values at The JJ Mack Building are beyond the minimum performance values contained in Building Regulations Part L2A.
PAINT
Paint (including intumescent) used throughout the building has a low to no VOC (volatile organic compound) content, contributing to a greater day one air quality.
WELL-ENABLED
The building has been designed to facilitate a tenant being able to achieve a Platinum WELL rating in their own fit out.